Knocking down internal walls is a great way to let the home flow and create great sociable light spaces.
Generally when knocking down internal walls there are structural implications and 9 times out of 10 a structural steel will need to be used. We can take care of everything from start to finish with your project. Including structural engineers & building control.
How long does a kitchen knock through take?
Your average kitchen knock through will take around 4-6 weeks. Although this can vary massively on the size of the project.
How much does a kitchen knock through cost?
The cost of a project like this can vary hugely. For a load baring wall to be removed including structural work, you would be looking at a starting price of £4,000. Then you would generally need a new kitchen – decoration – floor coverings.